Project overview*

Status Impact assessment repot (IAR) active
Description A 250-megawatt pumped storage hydroelectric power generation facility – the beneficial use of the decommissioned Kidston Gold Mine’s upper and lower pits.
Proponent Genex Power Limited
Location/s Kidston, Queensland approximately 280 km north-west of Townsville
Local government/s Etheridge Shire Council
Investment $330 million
Key features

The project would act as a natural battery storage, allowing energy to be stored and harnessed on demand and includes the following components:

  • an upper reservoir formed by a 20-metre-high dam around the existing Wises Pit
  • a lower reservoir utilising the existing Eldridge Pit
  • a powerhouse cavern with the capacity to generate 250 megawatts
  • a tailrace allowing water to pass from the powerhouse to the reservoirs
  • a spillway from the upper reservoir to the Copperfield River.
Expected completion 2021
Jobs
  • 370 (construction over two years)
  • 9 (operational)

IAR process

Date Activity
Currently Draft IAR being prepared
28 September 2018 Gazettal (PDF icon 250 KB) of 'coordinated project' declaration.
28 September 2018 Application, including initial advice statement submitted.

Read more about the IAR process.

* Project information supplied by proponent and subject to change.