Carmichael Coal Mine and Rail Project
If you have difficulty downloading documents, please email This email address is being protected from spambots. You need JavaScript enabled to view it.
Volumes 1–3
- Volume 1 - Project Wide Studies (
1.9 MB) - Volume 2 - Mine Studies (
2.4 MB) - Volume 3 - Rail Studies (
5.3 MB)
Volume 4 – Appendices
- Appendix A - Submissions Register (
2.5 MB) - Appendix B - Updated Mine Project Description (
8.1 MB) - Appendix C1 - Project Approvals Report (
4.3 MB) - Appendix C2 - Mine Applications (
142 KB) - Appendix C3a – Material Change of Use Applications for Rail Laydown Areas:
- Appendix C3a – Parts 1–5 (
26.2 MB) - Appendix C3a – Parts 6–9 (
14.8 MB) - Appendix C3b – Operational Works Applications for Excavation and Filling for the Rail Corridor:
- Appendix C3b - Part 1 (
27.5 MB) - Appendix C3b - Part 2 (
22.5 MB) - Appendix C3b - Part 3 (
15.5 MB) - Appendix C3b - Part 4 (
15.7 MB) - Appendix C3b - Part 5 (
25.8 MB) - Appendix C3b - Part 6 (
15.2 MB) - Appendix C3b - Part 7 (
14.5 MB) - Appendix C3c - Updated Application Forms For Rail Camps 1 to 3:
- Appendix C3c - Camp 1 (
282 KB) - Appendix C3c - Camp 2 (
307 KB) - Appendix C3c - Camp 3 (
305 KB) - Appendix C3d - Vegetation Reports for SP1 and Laydown Areas:
- Appendix C3d - SP1 Laydown Area Vegetation Reports (
6.4 MB) - Appendix C3d - SP1 Rail Alignment Vegetation Reports Part 1 (
14.4 MB) - Appendix C3d - SP1 Rail Alignment Vegetation Reports Part 2 (
43.0 MB) - Appendix C3e - Waterway Barrier Application for the Project (Rail) west (
12.8 MB) - Appendix C3f - Vegetation Reports for SP2 and Laydown Areas:
- Appendix C3f - Part 1 (
15.7 MB) - Appendix C3f - Part 2 (
4.94 MB) - Appendix C3f - Part 3 (
22.5 MB) - Appendix C3f - Part 4 (
22.8 MB) - Appendix C3g - Species Management Plan for the Project (Rail) (
11.2 MB) - Appendix C3h - Watercourse Determination for the Project (Rail) (
6.5 MB) - Appendix C3i - SP1 Construction Water Application (
2.7 MB) - Appendix C4a - Application for Preliminary Approval (Planning) (
17.8 MB) - Appendix C4b - Mine Workers Accommodation Village Approval Applications (
36.5 MB) - Appendix C4c - Industrial Precinct approval applications (
39.8 MB) - Appendix C4d - Airport Approval Applications (
47.5 MB) - Appendix C4e - Application to take water from the Belyando River (
9.7 MB) - Appendix C5a – Quarry Application - Borrow 7 (
40.5 MB) - Appendix C5b – Quarry Application - Disney Quarry (
35.0 MB) - Appendix C5c – Quarry Application - Moray Quarry (
30.5 MB) - Appendix C5d – Quarry Application - North Creek Quarry (
28.0 MB) - Appendix C5e – Quarry Application - South Back Creek Quarry (
24.5 MB) - Appendix C5f - NCA Vegetation Clearing Permit Application (
3.9 MB) - Appendix C6 - Proposed Draft Approvals Report (
2.3 MB) - Appendix D1 - Revised Social Impact Assessment Report (
5.6 MB) - Appendix D2 - Draft Social Impact Management Plan (
4.0 MB) - Appendix E - Economic Assessment Report (
2.5 MB) - Appendix F - Environmental Offset Package (
1.5 MB) - Appendix G - Project Commitments (
1.1 MB) - Appendix H - Matters of National Environmental Significance Report (
26.0 MB) - Appendix I1 - Revised Subsidence Assessment Report (
47.8 MB) - Appendix I2 - Draft Subsidence Management Plan (
18.0 MB) - Appendix J1 - Updated Mine Ecology Report (
9.3 MB) - Appendix J2 - BTF On-Site Monitoring Survey Report (
2.5 MB) - Appendix J3 - Doongmabulla & Mellaluka Springs Report (
11.4 MB) - Appendix J4 - Population Survey of the Waxy Cabbage Palm Report (
11.4 MB) - Appendix J5 - Offsite Infrastructure Ecological Assessment Report (
12.9 MB) - Appendix J6 - Offsite Infrastructure BioCondition Assessment Report (
8.1 MB) - Appendix J7a - Offsite Infrastructure PMAV Report (
11.6 MB) - Appendix J7b - Offsite Infrastructure PVMP Report (
2.6 MB) - Appendix J8 - Great Barrier Reef Wetland Protection Areas (
3.4 MB) - Appendix J9 - Adani Quarries Environmental Impact Review (
25.6 MB) - Appendix K1 - Mine Hydrogeology Report (
21.0 MB) - Appendix K2 - Water Balance Report (
13.5 MB) - Appendix K3 - Mine Water Quality Report (
26.5 MB) - Appendix K4 - Flood Mitigation and Creek Diversion Design Report (
20.3 MB) - Appendix K5 - Updated Mine Hydrology Report (
26.5 MB) - Appendix K6 - Mine Hydrogeology Report Addendum (
42.9 MB) - Appendix K7 - Numerical Groundwater Model Peer Review (
299 KB) - Appendix K8 - Groundwater Model Peer Review Comments (
142 KB) - Appendix L - Revised Mine Air Quality Assessment Report (
4.6 MB) - Appendix M - Greenhouse Gas Emissions Report (
2.0 MB) - Appendix N - Updated Mine Noise and Vibration Assessment Report (
20.3 MB) - Appendix O1 - Mine Waste Characterisation Report (
7.1 MB) - Appendix O2 - Mine Waste Management Strategy (
2.4 MB) - Appendix O3 - Landform Design Study Report (
2.8 MB) - Appendix P - Traffic Impact Assessment Report (
6.8 MB) - Appendix Q1 - Environmental Management Plan - Mine (
3.1 MB) - Appendix Q2 - Environmental Management Plan - Offsite (
927 KB) - Appendix R1 - Mine Closure and Rehabilitation Strategy (
5.6 MB) - Appendix R2 - Offsite Closure and Rehabilitation Strategy (
1.1 MB) - Appendix S1 - Rail Hydrology Report:
- Appendix S1a - Rail Hydrology Report (
6.7 MB) - Appendix S1b - Rail Hydrology and Hydraulics Project Design Criteria (
265 KB) - Appendix S1c - Rail Hydrology Drawings (
65.3 MB) - Appendix S2 - Bushfire Management Plan (
11.9 MB) - Appendix T1 - Strategic Cropping Land Assessment Report (
24.4 MB) - Appendix T2 - Rail Soil Survey Methodology (
5.9 MB) - Appendix U - Fauna Crossing Strategy (
10.5 MB) - Appendix V - Emergency Management Plan (
9.1 MB) - Appendix W - Environmental Management Plan - Rail (
4.0 MB) - Appendix X1 - Preliminary Closure and Rehabilitation Strategy - Rail (
4.1 MB) - Appendix X2 - Preliminary Closure and Rehabilitation Strategy - Quarries (
2.0 MB)
Read the project's environmental impact statement (EIS)
Read more about the project
Read more about the EIS/IAR process
