Project overview*

EIS status EIS active
Description A dam on the Broken River, a water distribution network including connecting water pipelines and instream distribution and storage of water, an irrigation precinct and a pumped hydro-electric power scheme.
Proponent Bowen River Utilities Pty Ltd
Location/s Upper Broken River Valley, 86 kilometers (km) south-east of Collinsville and 80 km west of Mackay. Map
Local government/s
  • Mackay Regional Council
  • Whitsunday Regional Council
  • Isaac Regional Council
Investment $2.9 billion
Key features
  • dam – a gravity fed dam on the Broken River with water storage capacity of up to 1,500,000 megalitres (ML)
  • water distribution network from the proposed dam north to the Peter Faust Dam and on to Bowen and Abbot Point, south to Eungella Dam and Moranbah – including water pipelines and instream distribution and storage of water with associated ancillary works, such as pump stations and power supply infrastructure
  • irrigation precinct – an irrigated agricultural development area of up to 25,000 hectares (ha) and associated in-stream and off-stream storages, trunk delivery works and on-farm infrastructure
  • pumped hydro-electric power storage and power generation infrastructure – power generation infrastructure producing 1.5 GW+ electricity supply and 7 GWhr+ pumped storage capacity, incorporating power stations (surface and underground), dams and reservoirs, waterways and power transmission infrastructure
  • ancillary works and infrastructure – for example, quarries and borrows, road and access development and upgrades, site establishment areas, laydowns, site amenities and accommodation, services and utilities (including electricity, telecommunications).
Construction state date 2022
Jobs
  • Up to 1,200 full time equivalent (FTE) (construction)
  • 675 FTE (operational).

Environmental impact statement (EIS) process

Date Activity
Currently Draft terms of reference for an EIS being prepared.
7 May 2020 Gazettal (PDF icon 249 KB) of ‘coordinated project’ declaration.
1 November 2019 Application, including initial advice statement (PDF icon 7.6 MB), submitted.

Further information

Read more about the EIS process.

* Project information supplied by proponent and subject to change.