Project overview*
| EIS status | Approved with conditions |
| Description | A 115-kilometre pipeline to enable the transfer of 30,000 megalitres of water per annum from the lower Fitzroy River to Gladstone. |
| Proponent | Gladstone Area Water Board |
| Location/s | The pipeline will run within the proposed Stanwell-Gladstone Infrastructure Corridor for the majority of its length before connecting with existing water infrastructure in the Gladstone State Development Area. Map |
| Local government/s |
|
| Key features |
|
*Project information supplied by proponent and subject to change.
Environmental impact statement (EIS) process
| Date | Activity |
|---|---|
| 6 November 2015 | The Coordinator-General extended the currency period for the EIS Evaluation Report from 3 February 2016 to 2 February 2018. |
| 13 November 2013 | The Coordinator-General extended the currency period for the EIS Evaluation Report from 3 February 2014 to 2 February 2016. |
| 4 November 2011 |
Commonwealth Minister for the Environment's approval of controlled action, subject to conditions.
|
| 2 February 2010 | Coordinator-General's report on EIS ( |
| 2 June 2009 | Supplementary EIS (SEIS) submitted. |
|
1 November 2008 to 15 December 2008 |
Public consultation on EIS.
|
| 30 October 2007 | Terms of reference ( |
|
25 August to 2007 to 24 September 2007 | Public consultation on draft terms of reference for EIS. |
| 3 August 2007 |
Gazettal of 'significant project' declaration ( |
| 11 July 2007 |
Project deemed a controlled action by Commonwealth Minister for the Environment.
|
| 30 May 2007 |
Application, including initial advice statement ( |
Project's EIS documents
Supplementary EIS
- Environmental impact statement supplementary report summary (
15 MB) - Environmental impact statement supplementary report (
1 MB)
AEIS Appendices
- Appendix a submissions (
6.5 MB) - Appendix b revised-list-of-proponent-commitments (
383 KB) - Appendix c development-approvals (
238 KB) - Appendix d regional-ecosystem-clearing-information (
68 MB) - Appendix e yellow-chat-research-proposal (
385 KB) - Appendix f revised-planning-environmental-management-plan (
2.6 MB) - Appendix g property-line-list (
361 KB)
EIS
- EIS summary (
5.1 MB) - EIS chapter 1 introduction (
10 MB) - EIS chapter 2 project-description (
16 MB) - EIS chapter 3 climate (
5.7 MB) - EIS chapter 4 land-use-and-infrastructure (
22 MB) - EIS chapter 5 soils-and-contanimated-land (
8 MB) - EIS chapter 6 terrestrial-flora (
6.9 MB) - EIS chapter 7 terrestrial-fauna (
14 MB) - EIS chapter 8 aquatic-flora-and-fauna (
22 MB) - EIS chapter 9 water-resources-and-water-quality (
6.5 MB) - EIS chapter 10 air-environment (
6.3 MB) - EIS chapter 11 waste (
5.9 MB) - EIS chapter 12 noise-and-vibration (
2.5 MB) - EIS chapter 13 transport-and-access-arrangements (
9.0 MB) - EIS chapter 14 cultural-heritage (
3.9 MB) - EIS chapter 15 social-and-economic-environment (
4.3 KB) - EIS chapter 16 hazard-and-risk (
9 MB) - EIS chapter 17 landscape-and-visual-impact-assessment (
14 KB) - EIS chapter 18 summary-of-impacts-and-cumulative-effects (
502 KB) - EIS chapter 19 sustainability-impacts (
3.7 MB) - EIS chapter 20 planning-environmental-management-plan (
6.4 KB)
EIS appendices
- Appendix a terms-of-reference-checklist (
316 KB) - Appendix b public-engagement-report (
29 MB) - Appendix c development-approvals (
188 KB) - Appendix d property-line-list (
158 KB) - Appendix e1 soils-and-contaminated-land (
4 MB) - Appendix e2 terrestrial-flora (
2.2 MB) - Appendix e3 terrestrial-fauna (
272 KB) - Appendix e4 aquatic-flora-and-fauna (
322 KB) - Appendix e5 noise-and-vibration (
430 KB) - Appendix f list-of-proponent-commitments (
180 KB) - Appendix g potential-impacts-on-matters-of-national-environmental-significance (
2.2 KB) - Appendix h eis-study-team (
144 KB)
Further information
For more information, visit the Gladstone-Fitzroy Water Pipeline website.