Lindeman Great Barrier Reef Resort Project
Status
Approved with conditions
Jobs
300-800 (construction) + 500 (operational)
Investment
$583 million
Project overview*
| EIS status | Approved with conditions |
| Description | The redevelopment and expansion of the existing resort at Lindeman Island |
| Proponent | Well Smart Investment Holdings (Bris) Pty Ltd |
| Location/s | 35 km south east of Airlie Beach of Shute Harbour on the mainland and approximately 13 km south east of Hamilton Island. |
| Local government/s | Mackay Regional Council |
| Investment | $583 million |
| Key features |
|
| Expected completion | 2032 |
| Jobs |
|
* Project information supplied by proponent and subject to change.
Environmental impact statement (EIS) process
| Date | Activity |
|---|---|
| 25 March 2024 | The Coordinator-General stated a new lapse date for the Coordinator-General’s EIS evaluation report of 26 March 2025 |
| 11 March 2022 | The Coordinator-General stated a new lapse date for the Coordinator-General’s EIS evaluation report of 26 March 2024. |
| 8 November 2018 | Commonwealth Minister for the Environment's approval of ‘controlled action’, subject to conditions. |
| 28 March 2018 | Coordinator-General's report on the EIS released.( The Coordinator-General's report has also been split into smaller documents, for easier download:
Revised draft EIS Revised draft EIS documentation |
| 19 December 2017 | The Coordinator-General accepted the draft EIS as the final EIS and is now preparing his EIS evaluation report. |
| 18 October 2017 | Additional information for the EIS requested by Coordinator-General. |
| 22 July to 4 September 2017 |
Draft EIS public consultation
|
| 2 February 2017 | Coordinator-General stated a new project declaration lapse date of 20 February 2018. |
| 21 August 2015 | Terms of reference for EIS ( |
| 30 May 2015 to 3 July 2015 | Draft terms of reference for EIS ( |
| 19 May 2015 |
Gazettal of 'coordinated project' declaration ( |
| 07 May 2015 | Commonwealth Minister for the Environment decided the project is a 'controlled action'. |
| 06 May 2015 |
Coordinated project application, including initial advice statement ( |
| 9 April 2015 | Project referred to Commonwealth Minister for the Environment. |
Further information
Lindeman Great Barrier Reef Resort Project’s EIS documents
If you have difficulty downloading documents, please email lindeman@coordinatorgeneral.qld.gov.au
- Revised Draft EIS
- Appendix A - revised draft EIS masterplan and tenure map
- Appendix B - draft Plan of development
- Appendix C - Irrigation Management Plan
- Appendix D - Superior Jetty Settings
- Appendix E - Proposed jetty upgrade and coastal works
- Appendix F - updated State Development Assessment Provisions
- Appendix G - Proponent response to submissions on the draft EIS
- Appendix H - Updated vegetation mapping
- Appendix I - Cyclone Shelter
- Appendix J - Proponent commitments
- Executive summary and information package (
12.2 MB) - Table of contents and glossary (
2.08 MB) - Chapter 1 – Introduction (
1.61 MB) - Chapter 2 – Project proponent (
1.55 MB) - Chapter 3 – Site description (
66.5 MB) - Chapter 4 – Project description (
45.4 MB) - Chapter 5 – Project alternatives (
26 MB) - Chapter 6 – Tenure (
10 MB) - Chapter 7 – Land use (
3.33 MB) - Chapter 8 – Coastal (
3.16 MB) - Chapter 9 – Marine ecology (
7.44 MB) - Chapter 10 – Flora and fauna (
15.1 MB) - Chapter 11 – Scenic values (
34.4 MB) - Chapter 12 – Cultural heritage (
8.3 MB) - Chapter 13 – Air quality (
7.56 MB) - Chapter 14 – Social (
2.24 MB) - Chapter 15 – Economic (
7.26 MB) - Chapter 16 – Noise and vibration (
4.83 MB) - Chapter 17 – Water quality (
3.44 MB) - Chapter 18 – Water resources (
8.76 MB) - Chapter 19 – Flooding (
3.1 MB) - Chapter 20 – Biosecurity (
1.94 MB) - Chapter 21 – Bushfire assessment (
10.8 MB) - Chapter 22 – Waste management (
2.96 MB) - Chapter 23 – Site contamination (
2.11 MB) - Chapter 24 – Infrastructure (
3.87 MB) - Chapter 25 – Transport (
18 MB) - Chapter 26 – Matters of national environmental significance (
163 MB) - Chapter 27 – Risk and hazard (
1.72 MB) - Chapter 28 – Environmental Management Plan (
4.63 MB) - Chapter 29 – Conclusion (
1.66 MB) - Chapter 30 – References (
1.63 MB)
EIS – Appendices
- Appendix A – Terms of reference (
2.08 MB) - Appendix B – Cross reference table for terms of reference (
1.71 MB) - Appendix C – Masterplan concept DBI design (
76.8 MB) - Appendix D – Proponent polices and commitments (
1.62 MB) - Appendix E – Protected matters (
1.54 MB) - Appendix F – Geotechnical assessment (
10.1 MB) - Appendix G – Planning framework assessment (
2.56 MB) - Appendix H – Coastal process investigations (
102 MB) - Appendix I – Terrestrial flora and fauna report (
10.5 MB) - Appendix J – Contaminated land technical report (
6.15 MB) - Appendix K – Air quality assessment (
8.66 MB) - Appendix L – Social impact assessment (
11 MB) - Appendix M – Solar diesel hybrid feasibility study (
7.87 MB) - Appendix N – Noise assessment (
11.6 MB) - Appendix O – Water infrastructure assessment (
6.13 MB) - Appendix P – Lindeman stormwater management plan and water balance (
102 MB) - Appendix Q – Flood study (
76.9 MB) - Appendix R – Biosecurity assessment (
2.18 MB) - Appendix S – Bushfire hazard assessment (
4.9 MB) - Appendix T – Waste management (
3.69 MB) - Appendix U – Cultural heritage management plan (
1.41 MB) - Appendix V – Non-Indigenous cultural heritage management plan (
6.41 MB) - Appendix W – Road impact assessment (
3.06 MB) - Appendix X – BMT WMB marine ecology report (
20.5 MB) - Appendix Y – Visual amenity literature review (
1.69 MB) - Appendix Z – Marine ecology assessment (
6.52 MB)
Last updated: 1 July 2026