Project overview*
| EIS status | Approved with conditions |
| Description | Dredging of the apron area and departure path of the Port of Hay Point, to increase the allowable draft of departing vessels. |
| Proponent | Ports Corporation of Queensland |
| Location/s | Port of Hay Point, 38 km south of Mackay. Map |
| Local government/s | Mackay Regional Council |
| Key features |
|
* Project information supplied by proponent and subject to change.
Key environmental impact statement (EIS) documents
EIS and IAS documents
- SEIS September 2005 (
40 MB)
- Port of Hay Point Capital Dredging Draft EIS (
27.7 MB) - Appendix A - Terms of Reference (
260 KB) - Appendix B - Stakeholder Consultation Plan (
343 KB) - Appendix C - Land Based Spoil Ground Selection (
23.9 MB) - Appendix C - Spoil Ground Selection (
18.6 MB) - Appendix D - Seagrass, Algae & Benthic Survey (
6.8 MB) - Appendix E - Benthic Survey of Fringing Coral Reefs (
57.1 MB) - Appendix F - Hydrodynamic and Water Quality Modelling (
12.4 MB) - Appendix G - Sediment Sampling and Analysis Report (
48.7 MB) - Appendix H - Cultural Heritage Management Plan (
1.1 MB)
- IAS August 2004 (
9.2 MB)
EIS process
Read more about the EIS process.
Australian Government approval
Commonwealth Minister for the Environment's approval of 'controlled action', subject to conditions.