Scenic Rim Agricultural Industrial Precinct

Status

Approved with conditions

Jobs

641 (construction) + 475 (operational)

Investment

$291 million

Project overview*

IAR statusApproved with conditions
Description The project proposes to establish an integrated agricultural industrial processing precinct, with a renewable energy power facility, converting waste to energy, on approximately 40 hectares (ha) of land.
Proponent Kalfresh Pty Ltd
Location/s

6200 – 6206 Cunningham Highway, Kalbar, approximately 85 km south-west of Brisbane City.

Find this and other projects on our map.

Local government/s Scenic Rim Regional Council
Investment $291 million
Key features
  • Conversion of rural zoned land to 40 ha of industrial lots ranging from 0.6 ha to 6 ha
  • 1.6 megawatt (MW) (scalable to 10 MW) renewable energy power facility, producing baseload power to supply the industrial precinct and the electricity grid
  • 50,000 tonne per annum composting facility
  • Manufacturing plants for vegetable processing
  • Internal roads and project offices
  • Intersection to Cunningham Highway
  • Onsite sewerage and wastewater treatment.
Construction start date 2024
Jobs
  • 641 direct full-time equivalent (FTE) jobs over 10 years (construction)
  • 475 direct FTE jobs (operational)

IAR process

DateActivity
8 May 2024 Coordinator-General's report ( 14.4 MB) on the IAR released.
5 March 2024

The Coordinator-General accepted the revised draft IAR as the final IAR.

Final Impact Assessment Report, including appendices.

12 September 2023 Coordinator-General stated a new project declaration lapse date of 5 April 2024.
6 March 2023 Coordinator-General stated a new project declaration lapse date of 3 October 2023.
30 March 2022 Coordinator-General stated a new project declaration lapse date of 1 April 2023.
30 July 2021 Coordinator-General stated a new project declaration lapse date of 1 April 2022.
27 November 2020 Coordinator-General stated a new project declaration lapse date of 1 August 2021.
1 October 2020 Additional information for the IAR requested by Coordinator-General.
16 May to 5 pm on 26 June 2020 Draft IAR submission period.
Draft IAR, including appendices.
31 May 2019 Gazettal of 'coordinated project' declaration (pdf_file 246 KB).
30 April 2019 Application, including initial advice statement (pdf_file 16.8 MB), submitted.

IAR documents

Appendix A

Appendix B

Appendix C

Appendix D

Appendix E

Appendix G

Appendix H

Appendix J

If you have difficulty downloading documents, please email SRAIP@coordinatorgeneral.qld.gov.au

Media releases

Further information

Read more about the IAR process.

* Project information supplied by proponent and subject to change.