Esmeralda Graphite project

Open cut graphite mine producing up to 200,000 tonnes per annum of graphite concentrate over a 53 year mine life.

Status

EIS Consultation

Jobs

100 (construction) + 192 (operational)

Investment

$666.4 million

About the project

The proponent, Qld Aus Graphite Pty Ltd (Graphinex), a wholly owned subsidiary of Graphinex Pty Ltd, proposes to develop the $666.4 million Esmeralda Graphite project. A new open-cut graphite mine; the project proposes to extract up to 3.5 million tonnes per annum of run-of-mine ore, producing up to 200,000 tonnes per annum of graphite concentrate over a 53 year mine life.

Located approximately 70km south of Croydon, the project involves:

  • development of an open-cut graphite mine and processing facilities
  • solar array and energy storage system with back-up diesel generation
  • water management infrastructure
  • mine infrastructure area, mine and product stockpiles and loading areas
  • access road and internal tracks and
  • accommodation facility, sewage and waste management infrastructure.

Graphinex proposes to transport the graphite concentrate by truck from the proposed mine to the Port of Townsville for export. Graphite is essential for a wide range of renewable energy applications, including battery technology.

Proponent Qld Aus Graphite Pty Ltd (Graphinex), a wholly owned subsidiary of Graphinex Pty Ltd
Location

70km south of Croydon, Queensland.

Find this and other projects on our map.

Local government
  • Croydon Shire Council
Investment $666.4 million capital expenditure
Jobs
  • 100 (construction)
  • 192 (operational)
Construction start date 2027/2028

Latest update

Public consultation on the draft EIS is being held from Thursday 5 November 2026 to Monday 14 December 2026.

Qld Aus Graphite Pty Ltd (Graphinex), a wholly owned subsidiary of Graphinex Pty Ltd prepared a draft EIS for the Esmeralda Graphite project.

The Coordinator-General released the draft EIS for public and government agency comment.

You are invited to have your say on the draft EIS, including the project’s potential direct and indirect environmental impacts and the effectiveness of measures proposed to manage those impacts. The Coordinator-General will consider your submission as part of the evaluation of the project’s environmental impacts.

Visit Have your say for details and to make an online submission. Comments close on 14 December 2026.

Environmental impact assessment process

This project has been declared a coordinated project by the Coordinator-General under the State Development and Public Works Organisation Act 1971. We play a role making sure benefits and risks are managed through a rigorous assessment process, and that approvals are coordinated across local, state and federal jurisdictions. Find out more about the coordinated project environmental impact assessment process.

Declaration date

11 July 2025

Assessment process

Coordinated project requiring an environmental impact statement (EIS)

Not a controlled action  under the Environment Protection and Biodiversity Conservation Act 1999.  

Current stage

Consultation on draft EIS

Declaration lapse date

29 March 2027

Assessment milestones

DateActivity
5 November 2026 to 14 December 2026

Public consultation on the draft EIS.

29 September 2025 Terms of reference for EIS ( 791.1 KB) released.
11 July 2025 Gazettal ( 242.9 KB) of 'coordinated project' declaration
2 July 2025

Application, including initial advice statement ( 14.0 MB) submitted

23 June 2025 Australian Minister for the Environment and Water decided the project is not a ‘controlled action’.

A project that has the potential to have a significant impact on matters of national environmental significance is called a 'controlled action' and requires approval under the Environment Protection and Biodiversity Conservation Act 1999 (Cth).

Assessment documents

* Graphinex has provided a commercial-in-confidence version of Appendix P (Technical report – Economic impact assessment) to the Coordinator-General to support the evaluation of the EIS. Graphinex has advised that Appendix P contains commercially sensitive information and is therefore not publicly available.

Further information