Explore current Coordinated Projects
-
Blackwater South Coking Coal project
Metallurgical coal mine with up to 8 million tonnes of coal per annum for approximately 90 years, for steel production.
-
Corvus Metallurgical Coal project
Underground coal mine extracting up to 10.5 million tonnes of run-of-mine coal generally suitable for steel production.
-
Mt Rawdon Pumped Hydro project
Proposal to develop a pumped hydro electricity generation facility involving construction of an upper reservoir and repurposing the mine pit created by the existing Mount Rawdon Mine for the lower reservoir.
-
North to East Australia Pipeline (Stage 2) project
Construction of an 899-kilometre gas pipeline and ancillary infrastructure connecting the Beetaloo Sub-basin to Queensland’s gas network.