Blackwater South Coking Coal project

Metallurgical coal mine with up to 8 million tonnes of coal per annum for approximately 90 years, for steel production.

Status

Terms of reference

Jobs

500 - 750 (construction) + 1,200 (operational)

Investment

$1 billion

About the project

The Blackwater South Coking Coal Project is a proposed open-cut metallurgical coal mine in the Bowen Basin, approximately 50 kilometres south-west of Blackwater. The project includes a coal handling and preparation plant, rail infrastructure, workforce accommodation, water management systems, power supply infrastructure, and associated mining facilities. The project would support up to 750 construction jobs and around 1,200 operational jobs, and is expected to produce up to 8 million tonnes per annum of metallurgical coal for export over a mine life of up to 90 years.

Proponent Whitehaven Blackwater Pty Ltd
Location/s

Approximately 50km south-west of Blackwater, 80km south-east Emerald.

Find this and other projects on our map.

Local government/s Central Highlands Regional Council
Jobs
  • 500 - 750 (construction)
  • 1,200 (operational)
Investment $1 billion
Construction start date July 2030 – July 2032

Environmental impact assessment process

This project has been declared a coordinated project by the Coordinator-General under the State Development and Public Works Organisation Act 1971. We play a role making sure benefits and risks are managed through a rigorous assessment process, and that approvals are coordinated across local, state and federal jurisdictions. Find out more about the coordinated project environmental impact assessment process.

Declaration date
3 May 2022
Assessment process
Coordinated project requiring an environmental impact statement (EIS)

Bilateral assessment for a controlled action under the Environment Protection and Biodiversity Conservation Act 1999. 

A project that has the potential to have a significant impact on matters of national environmental significance is called a 'controlled action' and requires approval under the Environment Protection and Biodiversity Conservation Act 1999 (Cth).

Current stage
The draft EIS is being prepared by the proponent
Declaration lapse date2 September 2029

Assessment milestones

DateActivity
20 August 2026 The Coordinator-General stated a new project declaration lapse date of 2 September 2029.
30 August 2024 The Coordinator-General stated a new project declaration lapse date of 2 September 2026.
1 March 2023 Terms of reference for an EIS (pdf_file 805 KB)
19 November 2022 to 16 December 2022 Draft terms of reference for EIS public consultation (pdf_file 662 KB)
20 September 2022 Australian Minister for the Environment decided that the project is a ‘controlled action’. 

A project that has the potential to have a significant impact on matters of national environmental significance is called a 'controlled action' and requires approval under the Environment Protection and Biodiversity Conservation Act 1999 (Cth).

3 May 2022 Gazettal (pdf_file 246 KB) of 'coordinated project' declaration.
19 November 2021 Initial advice statement (pdf_file 22.3 MB), submitted.

Further information